Return to Main Package
Project Documents

Construction Stormwater

Seebok Subdivision — NDEP CSW-56116

Project Status: Construction stormwater permit coverage is active for the Seebok development. The SWPPP and associated BMPs must be maintained through completion and termination of permit coverage.

  • 1. NDEP Construction Stormwater Permit — CSW-56116
    NDEP authorization for construction stormwater permit coverage
    View PDF
  • 2. Stormwater Pollution Prevention Plan (SWPPP)
    Site-specific stormwater compliance, inspection and BMP requirements
    View PDF
  • 3. SWPPP Site Plan
    Site plan identifying required stormwater BMP locations
    View PDF
TRANSFER AT SALE: Construction stormwater permit coverage and SWPPP responsibilities must be addressed when site ownership and/or operational control transfers. Seller and Buyer will coordinate the appropriate NDEP permit transition and Buyer assumption of post-closing SWPPP compliance obligations.
Call Now Button