Return to Main Package
-
1. NDEP Construction Stormwater Permit — CSW-56116
NDEP authorization for construction stormwater permit coverage
View PDF
-
2. Stormwater Pollution Prevention Plan (SWPPP)
Site-specific stormwater compliance, inspection and BMP requirements
View PDF
-
3. SWPPP Site Plan
Site plan identifying required stormwater BMP locations
View PDF
TRANSFER AT SALE: Construction stormwater permit coverage and SWPPP responsibilities must be addressed when site ownership and/or operational control transfers. Seller and Buyer will coordinate the appropriate NDEP permit transition and Buyer assumption of post-closing SWPPP compliance obligations.